Lecture 14 — Student Project Presentations (Part 1)

Session Info

Date: Tuesday, 2026-06-16  ·  Time: 16:20–18:10  ·  Room: YF108 Instructor: Dr. Zhijiang Chen

Format

  • Time per group: 12 minutes presentation + 5 minutes Q&A + 3 minutes peer evaluation.
  • Roughly half the groups present today; the remainder present in Lecture 15.

Required Content of Each Presentation

  1. Project description and scope.
  2. Cost estimate (Function Points or COCOMO II), with assumptions.
  3. Cash-flow forecast and at least two alternatives.
  4. NPV, IRR, payback, PI for each alternative.
  5. Sensitivity or risk analysis (Tornado, decision tree, or Monte Carlo).
  6. (Bonus) AI-cost dimension.
  7. Final recommendation with stakeholder justification.

Peer Evaluation Rubric

Criterion Weight
Clarity and structure 20%
Methodological correctness 30%
Use of sensitivity / risk analysis 20%
Persuasiveness of recommendation 20%
Q&A handling 10%

Instructor Grading

The instructor's rubric mirrors the peer rubric with two additions: (a) data realism, (b) integration of AI economics where relevant.


Prepared by Dr. Zhijiang Chen.